1. The South-East Asia Crude Oil Pipeline Company Limited, which is a joint venture with the Myanmar Oil and Gas Enterprise, will carry out maintenance work on the waterway to allow large oil tankers to enter and exit the Maday Island oil loading port. The dredging project will be carried out by Hopper Dredger, Reem Island (Call Sign: V7OJ2) vessel from 15 July to 30 September 2024
2. The coordinates for dredging with the Trailing Suction Hopper Dredger, Reem Island, are as follows: -
(3) Thanks to the Hopper Dredger, Reem Island (Call Sign: V7OJ2) ship, the dredging project will run for the convenience of large oil tankers entering and leaving the Maday Island oil loading port from 15 July to 30 September 2024. In order not to cause any delay during the operations, a Notice to Mariners has been issued to stop fishing or place fishing equipment and passing and anchoring of large and small ships, cargo boats, fishing boats and motor vessels within 500 metres of the work area mentioned above and within 250 metres of the shelter anchorage area.
Ministry of Energy
#TheGlobalNewLightOfMyanmar